The CMP Objective Measures GIS layer includes scoring by road segment where congested road segment locations that meet CMP Objective Measure criteria than others contain higher score totals and are given stronger consideration for managing congestion. The final mapping is a composite of all the scores where a maximum score of 15 can be attained, and road segment locations with scores greater than nine are shown in brown.
The CMP Objective Measures include: 1) increase mobility and reliability; 2) integrate modes and increase accessibility; 3) modernize infrastructure; 4) achieve Vision Zero; 5) make global connections; 6) strengthen security and enhance emergency preparedness; and 7) support Long-Range Plan principles.
CMP Objective Measure Database Fields
SegID – INRIX Segment ID
FRC – INRIX facility ID as applicable
Miles – INRIX segment miles
RoadNumber – INRIX Road Highway number
RoadName – INRIX Road name
State - INRIX State
County – INRIX County
Bearing – INRIXD Bearing
SEGID2X – INRIX Segment ID (string)
TTIWKD0708 – INRIX Travel Time Index 7-8 am
TTIWKD0809 – INRIX Travel Time Index 8-9 am
TTIWKD1617 – INRIX Travel Time Index 4-5 pm
TTIWKD1718 – INRIX Travel Time Index 5-6 pm
PTIWKD0708 – INRIX Planning Time Index 7-8 am
PTIWKD0809 – INRIX Planning Time Index 8-9 am
PTIWKD1617 – INRIX Planning Time Index 4-5 pm
PTIWKD1718 – INRIX Planning Time Index 5-6 pm
REFSPDMEAN – Reference or Freeflow speed
FFTIME – Freeflow Time
MAJTMC – Primary INRIX TMC associated with INRIX XD
NHS – Roadway segment on NHS based on NPMRDS database
Valid values:
1 – On NHS
2 – Not on NHS
LOTTRMAX – Roadway segment LOTTR value
TTTRMAX – Roadway segment TTTRMAX value
PHEDVAL – Roadway segment PHEDVAL value from conflated TMC
PHEDVALPMI – Roadway segment PHEDVAL value Per Mile of Roadway from conflated TMC
FROMTONODE – Travel Demand Model From To Node Link
VC7to8am15 – Travel Demand Model V/C 7 am to 8 am 2015
VC8to9am15 – Travel Demand Model V/C 8 am to 9 am 2015
VC4to5pm15 – Travel Demand Model V/C 4 am to 5 pm 2015
VC5to6pm15 – Travel Demand Model V/C 5 am to 6 pm 2015
VCMaxPH15 – Highest of 2015 am and pm V/Cs
VC7to8am50 – Travel Demand Model V/C 7 am to 8 am 2050
VC8to9am50 – Travel Demand Model V/C 8 am to 9 am 2050
VC4to5pm50 – Travel Demand Model V/C 4 am to 5 pm 2050
VC5to6pm50 – Travel Demand Model V/C 5 am to 6 pm 2050
VCMaxPH50 – Highest of 2050 am and pm V/Cs
PCPH7to8AM – Percent Change in V/C from 2015 to 2050 during 7-8am
PCPH8to9AM – Percent Change in V/C from 2015 to 2050 during 8-9am
PCPH4to5PM – Percent Change in V/C from 2015 to 2050 during 4-5pm
PCPH5to6PM – Percent Change in V/C from 2015 to 2050 during 5-6pm
PCMaxPH – Highest of Percent Change V/C
TRANSIT – Travel Demand Model road segments that include surface transit (bus or trolley)
Valid values:
0 – No road segments with transit
1 – Road segments with any transit
2 – Road segments with substantial transit (2 or more in urban; 3 or more suburban)
rmshash – PennDOT road segments county, route and segment identifiers from PennDOTs RMSSEG database
newaadtv2 – Average Annual Daily Traffic (AADT)
newadttv2 – Average Annual Daily Truck Traffic (AADTT)
DVRPCCR_RT – Average crash rate analyzed separately for the PA and NJ portions of DVRPC region based on similar roadway characteristics
SEG_CR_RT – Actual crash rate by roadway segment
CR_INDEX - Crash Rate index comparing actual crash rate with average rate (analyzed separately for the PA and NJ portions of DVRPC region)
FATALRATE – Fatal crash rate based on fatalities per 100,000,000 million vehicle miles traveled
CR_INDEX_C – Crash Rate
Valid values:
0 – Crash rate less than 4 times the state rate
1 – Crash rate 4 or more times the state rate
CRASH_CT – Number of crashes by roadway segment
FATAL_CT – Number of fatal crashes by roadway segment
TOT_INJ_CT – Number of injury crashes by roadway segment
MAJ_INJ_CT – Number of major injury crashes by roadway segment
MOD_INJ_CT – Number of moderate injuries by roadway segment
MIN_INJ_CT – Number of minor injuries by roadway segment
UNK_INJ_CT - Unknown injuries by roadway segment
CRASHPERMI – Crashes per Mile
FATMAJINJC – Fatal and major injuries by roadway segment
FATMIPMILE – Fatalities and Major Injuries Per Mile
FATMAPMICR – Fatalities and Major Injuries Per Mile Crash Index
Valid values:
0 – Less Than 5 or more fatal and major injuries per roadway segment mile
1 – 5 or more fatal and major injuries per roadway segment mile
TTTIMAXVAL – Highest Truck Travel Time Index value for 7-8am, 8-9am, 4-5pm and 5-6pm
FACIDNEW – Focus Roadway Corridor Facility identifier
FACIDDIR – Focus Roadway Corridor Facility direction, which is used to calculate AADT
TTICR - Roadway segment congestion threshold – TTICRP
Valid values:
0 – TTI value Less Than 1.20
1 – TTI value >= 1.20 and 1.50 (highly congested)
TTIWKDMAX - Highest of INRIX Travel Time Index 7-8am, 8-9am, 4-5pm, 5-6pm
PTIWKDMAX - Highest of INRIX Planning Time Index 7-8am, 8-9am, 4-5pm, 5-6pm
PTICR - Roadway segment reliability threshold - PTICRP
Valid values:
0 – PTI value Less Than 2.00
1 – PTI value >= 2.00 and = 3.00 and 3.50 (very highly unreliable)
LOTTRCR – Roadway segment reliable threshold
Valid values:
0 – LOTTR 2.00; highly unreliable
TTTRCR – Roadway segment reliable threshold (trucks on interstates only)
Valid values:
0 – TTTR value is 0
1 – TTTRMAX > 0 and Less Than 1.50; reliable
2 – TTTRMAX 1.50 to 2.49; moderately unreliable
3 – TTTRMAX >= 2.50; highly unreliable
PHEDCR – Roadway segment that experiences excessive delay above the regional average (24,355 PHED/Mile) (based on NPMRDS database, not on conflated INRIX database).
Valid values:
0 – Not above regional average
1 – At or above regional average
VC8550PCR – Travel Demand Model Segments with >=15% change from 2015 to 2050
Valid values:
0 – Segments = 15% Change in V/C
VC8550CR – Travel Demand Model Road segments in 2050 with 0.85 or more V/C
Valid values:
0 – Segments = 0.85 V/C
TTTICR – Truck Travel Time Index Roadway segment truck congestion threshold
Valid values:
0 – Less Than 2.00
1 – 2.00 to 3.00 (moderately congested)
2 - > 3.00 (highly congested)
SETRANSTCR – Transit Score Priority
Valid values:
0 – Not Priority
1 – Priority
CRSSRIID – NJ Crash Identifier SRI
popdenmnx2 – Road segments that intersect CBGs with population more than 2x the regional average
Valid values:
0 –No
1 – Yes
empdenmnx2 – Road segments that intersect CBGs with employment more than 2x the regional average
Valid values:
0 –No
1 – Yes
railsta1mi – Road segments that intersect 1 mile buffer of rail stations
Valid values:
0 –No
1 – Yes
trnstqtrmi – Road segments that intersect 1/4 mile buffer of bus transit routes
Valid values:
0 –No
1 – Yes
raillin1mi – Road segments that intersect 1 mile buffer of passenger rail
Valid values:
0 –No
1 – Yes
frtrail1mi – Road segments that intersect 1 mile buffer of freight rail
Valid values:
0 –No
1 – Yes
frtcntr1mi - Road segments that intersect freight centers
Valid values:
0 –No
1 – Yes
trnstscor - Road segments that intersect CBG with very and high composite (pop, emp and 0 veh households)
Valid values:
0 –No
1 – Yes
TPTIMAXVAL – Highest Truck Planning Time Index value for 7-8am, 8-9am, 4-5pm and 5-6pm.
TPTICR – Truck Planning Time Index Roadway segment truck reliability threshold
Valid values:
0 – Less Than 2.00
1 – 5.50 to 6.50 (moderately unreliable)
2 - > 6.50 (highly unreliable)
HVTRST1mi – Heavily used transit stations: 3 in Philadelphia and 1 in each of the other PA counties; road segments that intersect within 1-mile buffer
Valid values:
0 –No
1 – Yes
NUCPLT1MI – Road segments within 10 mile buffer of Limerick Nuclear Power Plant
Valid values:
0 –No
1 – Yes
RDBRGR1MI – Road segments within 1 mile buffer of major road bridges carrying > 100,000 AADT
Valid values:
0 –No
1 – Yes
FRBRGR1MI – Road segments within 1 mile buffer of major freight bridges
Valid values:
0 –No
1 – Yes
RLBRGR1MI – Road segments within 1 mile buffer of major passenger rail bridges
Valid values:
0 –No
1 – Yes
MIL1MI – Road segments within 1 mile buffer of major military sites
Valid values:
0 –No
1 – Yes
STDWTF1MI – Road segments within 1 mile buffer of major military sites
Valid values:
0 –No
1 – Yes
lucntr – Road segments that intersect 2050 land use centers
Valid values:
0 –No
1 – Yes
IREGAreas – Road segments that intersect Infill, Redevelopment and Emergency Growth Areas
Valid values:
0 –No
1 – Yes
ENSCAreas – Road segments where 90% or more of segment score low in the Environmental Screening Tool (or not environmental sensitive areas)
Valid values:
0 –No
1 – Yes
FLD100500 – Road segments that intersect 100-year and 500-year floodplain
Valid values:
0 –No
1 – Yes
IPDEJLI – Road segments that intersect IPD CBG’s with well above average or above average low income populations
Valid values:
0 –No
1 – Yes
IPDEJRM – Road segments that intersect IPD CBG’s with well above average or above average racial minority populations
Valid values:
0 –No
1 – Yes
TTICRP – Travel Time Index criteria Points
PTICRP – Planning Time Index criteria Points
PHEDCRP – PHED criteria Points
VC8550CRP – high anticipated V/C criteria Points
VC8550PCRP – high anticipated growth in V/C criteria Points
LOTTRCRP – LOTTR criteria Points
IMRMAXP – increase mobility and reliability maximum Points
trnstscorP – transit score criteria Points
railsta1mP – near passenger rail stations (1 mile) criteria Points
trnstqtrmP - bus transit quarter mile criteria Points
IMIAMXP – Integrate modes and increase accessibility maximum Points
TRANSITP - substantial bus transit from travel demand model criteria Points
raillin1mP – near transit passenger rail (1 mile) criteria Points
frtcntr1miP – near freight centers (1 mile) criteria Points
frtrail1miP – near freight rail facilities (1 mile) criteria Points
NHSP – national highway system criteria Points
MRMAXP – Modernize Infrastructure maximum Points
CRINDEXCRP – crash rates criteria Points
FATMAPMICP - fatal and major injury criteria Points
SVRMAXP – safety maximum Points
TTTICRP – Truck travel time index criteria Points
TPTICRP – Truck planning time index criteria Points
TTTRCRP – PM3 truck reliability criteria Points
GCMAXP – Global Connections maximum Points
popdenmnxP - population density criteria Points
empdenmnxP - employment density criteria Points
HVTRST1milP – heavily used transit stations (1 mile) criteria Points
NUCPLT1MIP – Limerick nuclear power plant evacuation zone (3 miles) criteria Points
RDBRGR1MIP – Major roadway bridges (1 mile) criteria Points
FRBGR1MIP – Major freight rail bridges (1 mile) criteria Points
RLBRGR1MIP - Major passenger rail bridges (1 mile) criteria Points
MIL1MIP – Military locations (1 mile) criteria Points
STDWTF1MIP – stadium and waterfront attraction locations (1 mile) criteria Points
SPMAXP – Strengthen cybersecurity maximum Points
lucntrP – land use center points
IREGAreasP – Infill and redevelopment areas, and emerging growth areas criteria Points
ENSCAreasP – Environmental Screening Tool criteria Points
FLD100500P – 100- and 500-year floodplains criteria Points
IPDEJLIP – IPD low income criteria Points
IPDEJRMP – IPD racial minority criteria Points
LRPMAXP – Long Range Plan maximum Points
CMPMAXP – Maximum CMP Objective Score points (add all maximums together)
MAXCRCNT – Count of CMP Objectives met
CMPMAXPMI - Maximum CMP Objective Score points (CMPMAXP above) divided by segment length
PHEDVAPMI2 – Roadway segment PHEDVAL (from INRIX TMC) value multiplied by roadway miles (from INRIX XD)
NEXTSEGID – Next directional INRIX Segment ID (SegID)
PREVSEGID – Previous directional INRIX Segment ID (SegID)